External resources

Events

« February 2012 »
SunMonTueWedThuFriSat
1234
567891011
12131415161718
19202122232425
26272829

Upcoming events

  • No upcoming events available

User login

Syndicate

Syndicate content

L-3 Completes First Phase of F/A-18C/D Roadmap Procurement Program

Contact: Rick Oyler For Immediate Release
L-3 Link Simulation & Training
817-619-3536

L-3 Completes First Phase of F/A-18C/D Roadmap Procurement Program

ARLINGTON, Texas, August 27, 2009 – L-3 Link Simulation & Training (L-3 Link) announced today it has successfully completed the first phase of the U.S. Navy’s F/A-18C/D Roadmap Procurement Program (RPP).

L-3 Link received this two-phase, five-year program in 2006. Under the first phase of the program L-3 Link has delivered six new F/A-18C/D Tactical Operational Flights Trainers (TOFTs). In addition, 16 existing U.S. Navy and U.S. Marine Corps F/A-18 simulators have been upgraded to the new F/A-18C/D TOFT configuration.

The new F/A-18C/D TOFTs and upgraded simulators have been integrated with new photo texture databases to increase visual acuity, additional audio capabilities, increased malfunctions and enhanced instructor operator station functionality. Numerous aircraft concurrency upgrades have been integrated on the F/A-18C/D TOFTs to provide each simulator with the platform’s latest aircraft capabilities.

“Our dedicated U.S. Navy and L-3 Link team has worked to ensure training device concurrency with the fleet aircraft,” said Frank Casano, director of Maritime Programs for L-3 Link. “This high level of cooperation is benefitting U.S. Navy and U.S. Marine Corps pilots today by enabling them to practice essential training and readiness tasks in the simulator before undertaking a mission in an aircraft.”

L-3 Link has begun work on phase two of the program, which calls for delivery of one additional F/A-18C/D TOFT each to Marine Corps Air Station (MCAS) Iwakuni, Japan; MCAS Miramar, Calif.; and the Joint Reserve Base in Fort Worth, Texas. Phase two also will focus on ensuring the training devices remain concurrent with the aircraft, developing additional visual system databases, inserting new training technologies and making improvements in aerodynamic fidelity. These updates will be deployed to all F/A-18C/D training devices in the U.S. Navy and Marine Corps fleet.

L-3 Link Simulation and Training, which is celebrating its 80th anniversary, is a systems integration organization that delivers and supports training systems and equipment to enhance operational proficiency. The company’s current services include conducting front-end analysis; program design; simulator design and production; field support; aircraft logistics support; training and courseware support; and air traffic control training. It has major operations in Arlington, Texas, and

other key bases of operation in Binghamton, N.Y.; Orlando, Fla.; Broken Arrow, Okla.; and Phoenix, Ariz.

Headquartered in New York City, L-3 Communications employs approximately 65,000 people worldwide and is a prime contractor in aircraft modernization and maintenance, C3ISR (Command, Control, Communications, Intelligence, Surveillance and Reconnaissance) systems and government services. L-3 is also a leading provider of high technology products, subsystems and systems. The company reported 2008 sales of $14.9 billion.

To learn more about L-3, please visit the company's Web site at www.L-3com.com.

Safe Harbor Statement Under the Private Securities Litigation Reform Act of 1995
Except for historical information contained herein, the matters set forth in this news release are forward-looking statements. Statements that are predictive in nature, that depend upon or refer to events or conditions or that include words such as "expects," "anticipates," "intends," "plans," "believes," "estimates," "will," "could" and similar expressions are forward-looking statements. The forward-looking statements set forth above involve a number of risks and uncertainties that could cause actual results to differ materially from any such statement, including the risks and uncertainties discussed in the company's Safe Harbor Compliance Statement for Forward-looking Statements included in the company's recent filings, including Forms 10-K and 10-Q, with the Securities and Exchange Commission. The forward-looking statements speak only as of the date made, and the company undertakes no obligation to update these forward-looking statements.

# # #

Poll

In which field are you?: